References

Proof from practice.

Anonymized project references from enterprise and public sector — verifiable, without confidential details.

Project experience at

  • Logistics
  • Mobility
  • Public-sector IT

Project Proofs

Proof that remains useful without confidential details

Anonymized project patterns show the artifacts that get delivered: architecture path, CI/CD gates, security baseline, observability and handover.

Public Sector – Stabilizing Digital Services

Challenge

Critical online service with unstable releases, security risks and missing technical transparency.

Contribution

Prioritized risks, documented architecture decisions, CI/CD gates, security hardening, observability and operations handover.

Outcome

Release and operations capability became traceable; detailed metrics and system context remain NDA-bound.

Enterprise – Incremental Legacy Replacement

Challenge

Grown core system with high business dependency, scarce expertise and risky changes.

Contribution

Strangler approach, interface facade, test strategy, migration path and first safe release cuts.

Outcome

The program got a modernization path without big bang; technical risks and next releases became decidable.

Enterprise – Ordering an Integration Landscape

Challenge

Many services and interfaces, inconsistent standards, unclear failure causes and growing operations effort.

Contribution

Defined API governance, gateway/tracing concept, technical standards and responsibility model for operations and future delivery.

Outcome

Failure causes became easier to narrow down, interface accountability clearer and releases easier to plan.

Enterprise – Anonymized AI System Analysis

Challenge

Grown system landscape, manual documentation and no structured knowledge base for migration and modernization initiatives.

Contribution

Built an AI-assisted system for anonymized application, source-code and DB analysis (local indexing), automated documentation and human-in-the-loop review.

Outcome

Use cases, target pictures, refactoring approaches and prototypes were derived from the existing landscape.

Use cases we deliver

Concrete results and clear responsibilities, anonymized and without invented metrics.

Active filter: Public Sector. Results: 1.

Architecture

Integration architecture for a public-sector programme

Challenge

Several source and target systems (2–3 each) were to be connected through a new solution acting as a transport and preparation layer in between.

Outcomes

  • Integration architecture with a clearly separated transport and preparation layer
  • Interfaces and data flows documented and traceable
  • Source and target systems decoupled

Proof decision-makers can inspect

No confidential client details and no invented metrics: these examples show role, starting point, delivered artifacts and why the approach transfers.

Contact

Contact us

We get back to you with a clear recommendation for the next step. Project start typically 1–2 weeks after the initial call.

More details (optional): organisation, role, topics
Your role
Topics
Select as many as apply